Progress to date 16/06/09


 

Restoration beginsThe shipping container arrived in Innisfail by train and was trucked to our car park on 10th June.

The 20 ton crane arrives and awkwardly maneuvers into place next to the castle in the top gardens, ready for action.

Piece by piece the turbine and necessary pipes are carefully positioned and bolted/welded into place.

3 days of crane work are up and Tilman will now spend the next 3 weeks working on the project.

His plans are to return in October, when the water level is very low, to finish off the work on the intake.

The system is planned to be complete by October, however there is still a lot of electrical work needed to connect this power to the park and into the power grid.

 

 

back arrow    Page 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9  foward

Logo Top
Logo Left Logo Logo Right
Logo Bot
hydro electric queensland's 1st hydro cairns waterfalls History
Restoration
Multimedia
Donations
thankyous
contact us
home
Progress to date
Nav bot
Paronella Park
Japoonvale Rd (Old Bruce Highway)
PO Box 88
Mena Creek
Queensland 4871
Australia
Visitor number 599
VN
Ph: 61 7 4065 0000
Fax: 61 7 4065 3022
eMail: info@paronellapark.com.au
Paronella Park - Copyright 2007