Restoration

We have found a company which specialises in this field of work.
They are looking to complete the work within our 12 month time frame
Their report found several important things:

 

The hydro electric building
The hydro electric building

The Turbine

  • The Boving & Co London Francis Bulb Turbine was found partly dismantled with the following parts on site:
    • Draft tube bend
    • Cover plate on draft tube side
    • Inspection plate of bulb housing
    • impeller
  • The following parts missing:
    • Inspection plate of draft tube bend
    • Pushrod from governor to actuator ring
    • Inline travel for introduction of pushrod to bulb casing
    • Stuffing box for the above
    • Draft tube with flange

We don’t have much information on the existing turbine apart from the brand.
It has a potential output of about 15kW with 250l/s.
This can be confirmed by the output of the generator which is rated at 25kVA (18kW)

back arrow    Page 1 | 2 | 3 | 4 | 5 | 6    foward

Logo Top
Logo Left Logo Logo Right
Logo Bot
Nav Left top
Restoration page 1
Restoration page 2
Restoration page 3
Restoration page 4
Restoration page 5
Restoration page 6
Restoration bottom
Nav Gap History
Restoration
Multimedia
Donations
thankyous
contact us
home
Progress to date
Nav bot
Paronella Park
Japoonvale Rd (Old Bruce Highway)
PO Box 88
Mena Creek
Queensland 4871
Australia
Ph: 61 7 4065 3225
Fax: 61 7 4065 3022
eMail: info@paronellapark.com.au
Paronella Park - Copyright 2007