space

Restoration
 

FrThe hydro electric building
In the Hydro Building

What needs to be done

  • Turbine needs to be dismantled and shipped away
  • Shot blasting of all corroded parts and application of primer layer active Zinc Dust coating Oldopox SW
  • Manufacturing and replacement of
    • several misc bolts and gates.
    • Inspection plate
    • Raft tube
  • Replacement of impeller by
    • Taking all relevant measurements of original space
    • Designing new impeller according to hydraulic calculations derived from the established parameters.
    • Manufacturing of core model
    • Manufacturing of mould
    • Casting impeller
    • Machining impeller to size required
  • Replacement of bearings
  • Reconditioning or replacing interior parts
  • Test assembly and coating with highly durable coating on water exposed surfaces
  • Reshipping back to the park

back arrow    Page 1 | 2 | 3 | 4 | 5 | 6    foward

Logo Top
Logo Left Logo Logo Right
Logo Bot
Nav Left top
Restoration page 1
Restoration page 2
Restoration page 3
Restoration page 4
Restoration page 5
Restoration page 6
Restoration bottom
Nav Gap History
Restoration
Multimedia
Donations
thankyous
contact us
home
Progress to date
Nav bot
Paronella Park
Japoonvale Rd (Old Bruce Highway)
PO Box 88
Mena Creek
Queensland 4871
Australia
Ph: 61 7 4065 3225
Fax: 61 7 4065 3022
eMail: info@paronellapark.com.au
Paronella Park - Copyright 2007