Progress to date Page 2
| A large crane being used on a nearby transmission line construction project was used to move the dismantled turbine and associated components onto trucks piece by piece, ready for transport to Germany.
The crane arrived on 11/04/08 and was covered by channel 7 and 9 and local newspapers. The turbine and associated parts were removed from the building and lowered on to a truck. Everything to be crated up and shipped off for restoration. The next stage will be to replace old pipes and prepare the hydro room for the reinstallation. |
Turbine Pieces Removed |